Installing an electric vehicle (EV) charger at home in Bath is generally a quick process, but the overall timeline depends on your property type, electrical setup, and installer availability. Below is a practical guide to what most homeowners can expect.

 

Typical Timeframe

For a standard 7kW wall-mounted charger (the most common type in UK homes):

  • Installation day:2 to 4 hours
  • From order to completion:Usually 1 to 3 weeks

If everything is straightforward, the physical fitting is often completed in half a day.

What Happens Before Installation?

  1. Quote and Remote Survey (1–7 days)
    Most installers ask for photos of your fuse board (consumer unit), electricity meter, and parking space. Some may conduct a virtual or in-person survey.
  2. DNO Notification or Approval (Up to 2 weeks if required)
    Your installer must notify your local Distribution Network Operator (DNO).
    1. In most cases, this is done after installation.
    1. If your electricity supply is limited or your home has an older connection, prior approval may be needed, which can add 1–2 weeks.
  3. Booking the Installation Date
    Availability varies but most companies can schedule within a few weeks.

What Affects the Installation Time?

Several factors can extend the timeline:

  • Distance from fuse board to driveway – Longer cable runs take more time.
  • Consumer unit upgrades – If your fuse board is outdated, it may need replacement.
  • Earthing arrangements – Some homes require additional safety equipment.
  • Cable routing complexity – Drilling through thick walls or running cables underground adds time.
  • Parking situation – Off-street parking is essential for most home chargers.

If electrical upgrades are required, installation may take a full day rather than a few hours.

Special Cases

  • Flats or leasehold properties: May require freeholder permission and can take 4–8 weeks or longer.
  • Rural homes: Occasionally require grid capacity checks.

Overall Expectation

For most homeowners in Bath with off-street parking and a modern fuse board, you can expect:

  • A simple half-day installation
  • Completion within 1–3 weeks from booking

Planning ahead is wise, especially if you are ordering a new electric vehicle and want charging ready before delivery.