Installing an electric vehicle (EV) charger at home in Bath is generally a quick process, but the overall timeline depends on your property type, electrical setup, and installer availability. Below is a practical guide to what most homeowners can expect.
Typical Timeframe
For a standard 7kW wall-mounted charger (the most common type in UK homes):
- Installation day:2 to 4 hours
- From order to completion:Usually 1 to 3 weeks
If everything is straightforward, the physical fitting is often completed in half a day.
What Happens Before Installation?
- Quote and Remote Survey (1–7 days)
Most installers ask for photos of your fuse board (consumer unit), electricity meter, and parking space. Some may conduct a virtual or in-person survey. - DNO Notification or Approval (Up to 2 weeks if required)
Your installer must notify your local Distribution Network Operator (DNO).- In most cases, this is done after installation.
- If your electricity supply is limited or your home has an older connection, prior approval may be needed, which can add 1–2 weeks.
- Booking the Installation Date
Availability varies but most companies can schedule within a few weeks.
What Affects the Installation Time?
Several factors can extend the timeline:
- Distance from fuse board to driveway – Longer cable runs take more time.
- Consumer unit upgrades – If your fuse board is outdated, it may need replacement.
- Earthing arrangements – Some homes require additional safety equipment.
- Cable routing complexity – Drilling through thick walls or running cables underground adds time.
- Parking situation – Off-street parking is essential for most home chargers.
If electrical upgrades are required, installation may take a full day rather than a few hours.
Special Cases
- Flats or leasehold properties: May require freeholder permission and can take 4–8 weeks or longer.
- Rural homes: Occasionally require grid capacity checks.